Estimating Construction Duration for Public Roads During the Preplanning Phase

Article Properties
Cite
Czarnigowska, A., and A. Sobotka. “Estimating Construction Duration for Public Roads During the Preplanning Phase”. Journal of Engineering, Project, and Production Management, vol. 4, no. 1, 2014, pp. 26-35, https://doi.org/10.32738/jeppm.201401.0004.
Czarnigowska, A., & Sobotka, A. (2014). Estimating Construction Duration for Public Roads During the Preplanning Phase. Journal of Engineering, Project, and Production Management, 4(1), 26-35. https://doi.org/10.32738/jeppm.201401.0004
Czarnigowska A, Sobotka A. Estimating Construction Duration for Public Roads During the Preplanning Phase. Journal of Engineering, Project, and Production Management. 2014;4(1):26-35.
Journal Category
Technology
Technology (General)
Industrial engineering
Management engineering
Citations
Title Journal Journal Categories Citations Publication Date
Estimating the volume of civil construction materials by machine learning models Asian Journal of Civil Engineering 2 2023
Conceptual estimation of construction duration and cost of public highway projects

Journal of Information Technology in Construction
  • Technology: Technology (General): Industrial engineering. Management engineering: Information technology
  • Social Sciences: Industries. Land use. Labor: Special industries and trades: Construction industry
  • Technology: Engineering (General). Civil engineering (General)
1 2022
Citations Analysis
The category Technology: Technology (General): Industrial engineering. Management engineering: Information technology 1 is the most commonly referenced area in studies that cite this article.