Cost Escalation, Schedule Overruns and Quality Shortfalls on Construction Projects: The Case of Zambia | International Journal of Construction Management |
- Social Sciences: Commerce: Business: Personnel management. Employment management
- Technology: Engineering (General). Civil engineering (General)
- Technology: Building construction: Architectural engineering. Structural engineering of buildings
| 28 | 2013 |
Zambia Development Agency. (2016). Zambia investment and Business. Retrieved from http://www.zda.org.zm/cost/en/Cost%20of%20Doing%20Business/Land%20and%20Buildings%20Costs on June 2018. | | | | |
Yalley, P. P. and Kwan, A. S. K. (2008). Use of Waste and low Energy Materials in Building Block Construction. 25th Conference on Passive and Low Energy Architecture (PLEA), Dublin. | | | | |
YN Construction. (2015). Tilt-Up Construction = Cost Effective Design and Longevity. Retrieved from yncon.co.za/tilt-up-construction-cost-effective-designand- longevity on March 28th 2018. | | | | |
Urmson, C. R., Reay, A. M., and Toulmin, S. H. (2013). Lessons learnt from the performance of buildings incorporating tilt-up construction in the Canterbury Earthquakes. 2013 New Zealand Structural Engineering Society Conference. | | | | |