Solving a real-world large-scale cutting stock problem: A clustering-assignment-based model

Article Properties
  • Language
    English
  • Publication Date
    2022/10/31
  • Indian UGC (journal)
  • Refrences
    27
  • Xinye Hao Department of Industrial Engineering, Tsinghua University, Beijing, China ORCID (unauthenticated)
  • Changchun Liu Department of Industrial Engineering, Tsinghua University, Beijing, ChinaInstitute of Operations Research & Analytics, National University of Singapore, Singapore ORCID (unauthenticated)
  • Maoqi Liu Department of Industrial Engineering, Tsinghua University, Beijing, ChinaInstitute of Operations Research & Analytics, National University of Singapore, Singapore
  • Canrong Zhang Logistics Engineering and Simulation Laboratory, Shenzhen International Graduate School, Tsinghua University, Shenzhen, China ORCID (unauthenticated)
  • Li Zheng Department of Industrial Engineering, Tsinghua University, Beijing, China
Journal Categories
Technology
Engineering (General)
Civil engineering (General)
Technology
Manufactures
Production management
Operations management
Technology
Technology (General)
Industrial engineering
Management engineering
Technology
Technology (General)
Industrial engineering
Management engineering
Information technology
Refrences
Title Journal Journal Categories Citations Publication Date
Title International Journal of Production Research
  • Technology: Technology (General): Industrial engineering. Management engineering: Information technology
  • Technology: Manufactures
  • Technology: Manufactures: Production management. Operations management
  • Technology: Technology (General): Industrial engineering. Management engineering
  • Technology: Engineering (General). Civil engineering (General)
2020
Column Generation 2006
Computers and Intractability: A Guide to the Theory of NP-Completeness 1979
An Efficient Heuristic Approach for Irregular Cutting Stock Problem in Ship Building Industry

Mathematical Problems in Engineering
  • Technology: Engineering (General). Civil engineering (General)
  • Science: Mathematics
  • Science: Mathematics
  • Technology: Engineering (General). Civil engineering (General)
  • Technology: Engineering (General). Civil engineering (General)
5 2016
Two-dimensional cutting stock problem with sequence dependent setup times European Journal of Operational Research
  • Technology: Manufactures: Production management. Operations management
  • Technology: Technology (General): Industrial engineering. Management engineering
  • Technology: Engineering (General). Civil engineering (General)
20 2018