Application of Mathematical Matrix to Integrate Project Schedule and Cost

Article Properties
  • Language
    English
  • Publication Date
    1999/09/01
  • Indian UGC (journal)
  • Refrences
    7
  • Hyun-Soo Lee Member, ASCEAsst. Prof., Dept. of Arch., Seoul Nat. Univ., Seoul, South Korea, 151-742.Post Doc. Res., Dept. of Arch., Seoul Nat. Univ., Seoul, South Korea, 151-742.
  • Kyoo Jin Yi Member, ASCEAsst. Prof., Dept. of Arch., Seoul Nat. Univ., Seoul, South Korea, 151-742.Post Doc. Res., Dept. of Arch., Seoul Nat. Univ., Seoul, South Korea, 151-742.
Journal Categories
Technology
Building construction
Architectural engineering
Structural engineering of buildings
Technology
Engineering (General)
Civil engineering (General)
Technology
Technology (General)
Industrial engineering
Management engineering
Information technology
Refrences
Title Journal Journal Categories Citations Publication Date
Project planning, scheduling, and control in construction 1995
Project management for construction 1989
Precedence and arrow networking techniques for construction 1978
10.1061/(ASCE)0733-9364(1996)122:1(7)
Teicholz P. M. ( 1987). “Current needs for cost control systems.” Project controls: Needs and solutions C. W. Ibbs and D. B. Ashley eds. ASCE New York 47–57.