Methodology for Prioritizing Cost-Effective Construction Technologies

Article Properties
  • Language
    English
  • Publication Date
    1998/05/01
  • Indian UGC (journal)
  • Refrences
    24
  • Y. Rosenfeld Head, Lab. for Automation and Robotics in Constr.—Technion, Dept. of Civ. Engrg., Nat. Build. Res. Inst., Technion City, 32000 Haifa, Israel. E-mail: [email protected].
  • R. Navon Sr. Lect.—Technion, Dept. of Civ. Engrg., Nat. Build. Res. Inst., Technion City, 32000 Haifa, Israel. E-mail: [email protected] http://techunix.technion.ac.il/∼cvronie/.
  • L. Cohen Grad. Student and Israel Airforce Offcr., Technion-Israel Inst. of Technol.,
Journal Categories
Technology
Building construction
Architectural engineering
Structural engineering of buildings
Technology
Engineering (General)
Civil engineering (General)
Technology
Technology (General)
Industrial engineering
Management engineering
Information technology
Refrences
Title Journal Journal Categories Citations Publication Date
Cutting housing construction time: the Israeli experience 1990–92. 1995
Motivating construction productivity: learning from other disciplines. 1983
10.1061/(ASCE)0733-9364(1987)113:2(235)
10.1061/(ASCE)0733-9364(1983)109:2(245)
10.1061/(ASCE)0733-9364(1990)116:3(399)