AIMS-MUPSA software package for multi-unit PSA

Article Properties
Cite
Han, Sang Hoon, et al. “AIMS-MUPSA Software Package for Multi-Unit PSA”. Nuclear Engineering and Technology, vol. 50, no. 8, 2018, pp. 1255-6, https://doi.org/10.1016/j.net.2018.06.012.
Han, S. H., Oh, K., Lim, H.-G., & Yang, J.-E. (2018). AIMS-MUPSA software package for multi-unit PSA. Nuclear Engineering and Technology, 50(8), 1255-1265. https://doi.org/10.1016/j.net.2018.06.012
Han, Sang Hoon, Kyemin Oh, Ho-Gon Lim, and Joon-Eon Yang. “AIMS-MUPSA Software Package for Multi-Unit PSA”. Nuclear Engineering and Technology 50, no. 8 (2018): 1255-65. https://doi.org/10.1016/j.net.2018.06.012.
Han SH, Oh K, Lim HG, Yang JE. AIMS-MUPSA software package for multi-unit PSA. Nuclear Engineering and Technology. 2018;50(8):1255-6.
Journal Categories
Technology
Electrical engineering
Electronics
Nuclear engineering
Nuclear engineering
Atomic power
Technology
Engineering (General)
Civil engineering (General)
Refrences
Title Journal Journal Categories Citations Publication Date
Study on Quantification Method Based on Monte Carlo Sampling for Multiunit Probabilistic Safety Assessment Models Nuclear Engineering and Technology
  • Technology: Electrical engineering. Electronics. Nuclear engineering: Nuclear engineering. Atomic power
  • Technology: Electrical engineering. Electronics. Nuclear engineering: Nuclear engineering. Atomic power
  • Technology: Engineering (General). Civil engineering (General)
7 2017
Dagger-sampling Monte Carlo for system unavailability evaluation 1980
Multi-unit Level 3 probabilistic safety assessment: Approaches and their application to a six-unit nuclear power plant site Nuclear Engineering and Technology
  • Technology: Electrical engineering. Electronics. Nuclear engineering: Nuclear engineering. Atomic power
  • Technology: Electrical engineering. Electronics. Nuclear engineering: Nuclear engineering. Atomic power
  • Technology: Engineering (General). Civil engineering (General)
16 2018
Multi-unit Level 2 probabilistic safety assessment: Approaches and their application to a six-unit nuclear power plant site Nuclear Engineering and Technology
  • Technology: Electrical engineering. Electronics. Nuclear engineering: Nuclear engineering. Atomic power
  • Technology: Electrical engineering. Electronics. Nuclear engineering: Nuclear engineering. Atomic power
  • Technology: Engineering (General). Civil engineering (General)
25 2018
Multi-unit Level 1 probabilistic safety assessment: Approaches and their application to a six-unit nuclear power plant site Nuclear Engineering and Technology
  • Technology: Electrical engineering. Electronics. Nuclear engineering: Nuclear engineering. Atomic power
  • Technology: Electrical engineering. Electronics. Nuclear engineering: Nuclear engineering. Atomic power
  • Technology: Engineering (General). Civil engineering (General)
34 2018
Citations
Title Journal Journal Categories Citations Publication Date
Optimization Method for Offsite Consequence Analysis by Efficient Plume Segmentation Nuclear Engineering and Technology
  • Technology: Electrical engineering. Electronics. Nuclear engineering: Nuclear engineering. Atomic power
  • Technology: Electrical engineering. Electronics. Nuclear engineering: Nuclear engineering. Atomic power
  • Technology: Engineering (General). Civil engineering (General)
2024
A preliminary safety inspection methodology in the UAE using AIMS-PSA for risk assessment of APR1400 LOCA transients Progress in Nuclear Energy
  • Technology: Electrical engineering. Electronics. Nuclear engineering: Nuclear engineering. Atomic power
  • Technology: Electrical engineering. Electronics. Nuclear engineering
  • Technology: Engineering (General). Civil engineering (General)
2024
An FE-MCS based modeling method for event sequence development for the multi-module probabilistic risk assessment Progress in Nuclear Energy
  • Technology: Electrical engineering. Electronics. Nuclear engineering: Nuclear engineering. Atomic power
  • Technology: Electrical engineering. Electronics. Nuclear engineering
  • Technology: Engineering (General). Civil engineering (General)
2024
A practical approach to treating time dependencies between diesel generator failures and offsite power recovery in multi-unit PSA Reliability Engineering & System Safety
  • Technology: Technology (General): Industrial engineering. Management engineering: Information technology
  • Technology: Manufactures: Production management. Operations management
  • Technology: Technology (General): Industrial engineering. Management engineering
  • Technology: Engineering (General). Civil engineering (General)
2024
An event sequence modeling method in multi-unit probabilistic risk assessment for high temperature gas-cooled reactor Annals of Nuclear Energy
  • Technology: Electrical engineering. Electronics. Nuclear engineering: Nuclear engineering. Atomic power
  • Technology: Electrical engineering. Electronics. Nuclear engineering
  • Technology: Engineering (General). Civil engineering (General)
4 2023
Citations Analysis
The category Technology: Engineering (General). Civil engineering (General) 26 is the most commonly referenced area in studies that cite this article. The first research to cite this article was titled Development of logical structure for multi-unit probabilistic safety assessment and was published in 2018. The most recent citation comes from a 2024 study titled Optimization Method for Offsite Consequence Analysis by Efficient Plume Segmentation. This article reached its peak citation in 2021, with 8 citations. It has been cited in 8 different journals, 50% of which are open access. Among related journals, the Reliability Engineering & System Safety cited this research the most, with 10 citations. The chart below illustrates the annual citation trends for this article.
Citations used this article by year