DISCUSSION. CIVIL ENGINEERING CONSTRUCTION UNDERWATER. | 1954/11/01 | English | |
DISCUSSION. THE EFFECTS OF JET AIRCRAFT ON AIRFIELD PAVEMENTS, AND ASSOCIATED PROBLEMS. | 1954/01/01 | English | |
DISCUSSION. SOME PROBLEMS IN THE DISPOSAL OF INDUSTRIAL EFFLUENTS AND DOMESTIC WASTES. | 1952/03/01 | English | |
DISCUSSION. THE CONSTRUCTION OF KAFR EL KAYAT RAILWAY BRIDGE. | 1952/03/01 | English | |
RAILWAY ARCHITECTURE. | 1954/01/01 | English | |
CORRESPONDENCE. THE DESIGN AND CONSTRUCTION OF THE BRITISH EUROPEAN AIRWAYS HANGARS AT LONDON AIRPORT, WITH PARTICULAR REFERENCE TO PRESTRESSED CONCRETE. | 1953/07/01 | English | |
RAINFALL, RUNOFF, AND STORAGE : ELAN AND CLAERWEN GATHERING GROUNDS. | 1954/07/01 | English | |
DISCUSSION. THE CONSTRUCTION OF A NEW RUNWAY AT AMMAN, JORDAN. | 1954/10/01 | English | |
CIVIL ENGINEERING CONSTRUCTION UNDER WATER. | 1954/11/01 | English | |
EXTENSIONS AT TAKORADI HARBOUR. | 1954/10/01 | English | |
DISCUSSION. THE DESIGN OF A REINFORCED-CONCRETE FACTORY AT BRYNMAUR, SOUTH WALES. | 1953/11/01 | English | |
DISCUSSION. CONSOLIDATION OF BALLAST. | 1956/05/01 | English | |
CORRESPONDENCE. RAINFALL, RUN-OFF, AND STORAGE : ELAN AND CLAERWEN GATHERING GROUNDS. | 1954/11/01 | English | |
DISCUSSION. USES OF AERATED CEMENT GROUT AND MORTAR IN STABILIZATION OF SLIPS IN EMBANKMENTS, LARGE-SCALE TUNNEL REPAIRS, AND OTHER WORKS. | 1956/01/01 | English | |
DISCUSSION. MECHANICAL SURFACING OF ROADS. | 1952/10/01 | English | |
DISCUSSION. THE ROOFING OF CLEADON RESERVOIR. | 1956/07/01 | English | |
THE NEW SLIPWAY AT BEAUMARIS. | 1956/01/01 | English | |
DISCUSSION. SELECTED ASPECTS OF THE GEOMETRIC DESIGN OF AIRPORTS. | 1956/01/01 | English | |
CORRESPONDENCE. THE PREDICTION OF VENTURI-METER COEFFICIENTS AND THEIR VARIATION WITH ROUGHNESS AND AGE. | 1954/11/01 | English | |
CORRESPONDENCE. THE LYNMOUTH FLOOD OF AUGUST 1952. | 1953/11/01 | English | |
THE CAITHNESS REGIONAL WATER SUPPLY SCHEME. | 1956/07/01 | English | |
DISCUSSION. THE HISTORICAL DEVELOPMENT OF STRUCTURAL THEORY. | 1952/11/01 | English | |
THE OXTON BY-PASS EXTENSION. | 1956/05/01 | English | |
CORRESPONDENCE. MEASUREMENT AND UTILIZATION OF THE WATER RESOURCES OF THE NILE BASIN. | 1954/07/01 | English | |
THE ROAD SURFACE AS A FACTOR IN STREET LIGHTING. | 1954/10/01 | English | |
DESIGN OF BRIDGE PIERS EMBEDDED IN COHESIONLESS MATERIAL, TAKING INTO ACCOUNT THEIR FLEXIBILITY. | 1956/07/01 | English | |
ROAD PAPER. DISCUSSION. RECENT DEVELOPMENTS IN HIGHWAY BRIDGE DESIGN IN HAMPSHIRE. | 1952/05/01 | English | |
THE HISTORICAL DEVELOPMENT OF STRUCTURAL THEORY. | 1952/11/01 | English | |
THE GENERALIZED GOULD'S FUNCTION. | 1953/03/01 | English | |
CORRESPONDENCE. SAGGING TWIN O.4 SQ.-IN. COPPER EQUIVALENT S.C.A. CONDUCTOR. | 1956/03/01 | English | |