A I I E Transactions

Title Publication Date Language Citations
An EOQ Model for Items with Weibull Distribution Deterioration1973/12/01English393
Reliable Preventive Maintenance Scheduling1979/09/01English253
Models for Understanding Flexible Manufacturing Systems1980/12/01English166
A Generalized EOQ Model for Items with Weibull Distribution Deterioration1974/06/01English151
Two Single Machine Sequencing Problems Involving Controllable Job Processing Times1980/09/01English151
Models of automatic transfer lines with inventory banks a review and comparison1978/06/01English136
Lagrangean Relaxation Applied to Capacitated Facility Location Problems1978/03/01English134
Multiple Resource–Constrained Scheduling Using Branch and Bound1978/09/01English132
Mathematical Programming Solution of a Hoist Scheduling Program1976/06/01English123
Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures1973/12/01English115
The Effect of Interstage Buffer Storage on the Output of Two Unreliable Production Units in Series, with Different Production Rates1979/03/01English107
Optimal Two-Stage Production Scheduling with Setup Times Separated1979/09/01English99
Computerized Layout Design: A Branch and Bound Approach1975/09/01English98
Analysis of Transfer Lines Consisting of Two Unreliable Machines with Random Processing Times and Finite Storage Buffers1981/03/01English98
Scheduling Policies for Automatic Warehousing Systems: Simulation Results1978/09/01English83
An Order-Level Lot-Size Inventory Model for Deteriorating Items1977/03/01English82
Minimum Cost Quality Control Tests1969/03/01English81
Heuristic Procedures for the Single Operation, Multi-Item Loading Problem1979/12/01English76
Scheduling Jobs on a Number of Identical Machines1974/03/01English76
A Loading and Balancing Methodology for Job Shop Control1974/12/01English75
Effects of Operator Stance on Pushing and Pulling Tasks1974/09/01English71
A Transportation Location-Allocation Model for Regional Blood Banking1979/06/01English71
A Comparison of Due-Date Selection Rules1981/06/01English70
A Biomechanical Model for Analysis of Symmetric Sagittal Plane Lifting1970/03/01English67
Operator Scheduling1979/03/01English67
Optimizing Transportation Problems with Multiple Objectives1973/12/01English66
Heuristic Algorithms for Multistage Flowshop Scheduling Problem1972/03/01English66
A Biomechanical Computerized Simulation of Human Strength1975/03/01English65
An Improved Method for Scheduling Independent Tasks1971/09/01English65
Inventory control under a probabilistic time-varying, demand pattern1978/12/01English64