An EOQ Model for Items with Weibull Distribution Deterioration | 1973/12/01 | English | 393 |
Reliable Preventive Maintenance Scheduling | 1979/09/01 | English | 253 |
Models for Understanding Flexible Manufacturing Systems | 1980/12/01 | English | 166 |
A Generalized EOQ Model for Items with Weibull Distribution Deterioration | 1974/06/01 | English | 151 |
Two Single Machine Sequencing Problems Involving Controllable Job Processing Times | 1980/09/01 | English | 151 |
Models of automatic transfer lines with inventory banks a review and comparison | 1978/06/01 | English | 136 |
Lagrangean Relaxation Applied to Capacitated Facility Location Problems | 1978/03/01 | English | 134 |
Multiple Resource–Constrained Scheduling Using Branch and Bound | 1978/09/01 | English | 132 |
Mathematical Programming Solution of a Hoist Scheduling Program | 1976/06/01 | English | 123 |
Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures | 1973/12/01 | English | 115 |
The Effect of Interstage Buffer Storage on the Output of Two Unreliable Production Units in Series, with Different Production Rates | 1979/03/01 | English | 107 |
Optimal Two-Stage Production Scheduling with Setup Times Separated | 1979/09/01 | English | 99 |
Computerized Layout Design: A Branch and Bound Approach | 1975/09/01 | English | 98 |
Analysis of Transfer Lines Consisting of Two Unreliable Machines with Random Processing Times and Finite Storage Buffers | 1981/03/01 | English | 98 |
Scheduling Policies for Automatic Warehousing Systems: Simulation Results | 1978/09/01 | English | 83 |
An Order-Level Lot-Size Inventory Model for Deteriorating Items | 1977/03/01 | English | 82 |
Minimum Cost Quality Control Tests | 1969/03/01 | English | 81 |
Heuristic Procedures for the Single Operation, Multi-Item Loading Problem | 1979/12/01 | English | 76 |
Scheduling Jobs on a Number of Identical Machines | 1974/03/01 | English | 76 |
A Loading and Balancing Methodology for Job Shop Control | 1974/12/01 | English | 75 |
Effects of Operator Stance on Pushing and Pulling Tasks | 1974/09/01 | English | 71 |
A Transportation Location-Allocation Model for Regional Blood Banking | 1979/06/01 | English | 71 |
A Comparison of Due-Date Selection Rules | 1981/06/01 | English | 70 |
A Biomechanical Model for Analysis of Symmetric Sagittal Plane Lifting | 1970/03/01 | English | 67 |
Operator Scheduling | 1979/03/01 | English | 67 |
Optimizing Transportation Problems with Multiple Objectives | 1973/12/01 | English | 66 |
Heuristic Algorithms for Multistage Flowshop Scheduling Problem | 1972/03/01 | English | 66 |
A Biomechanical Computerized Simulation of Human Strength | 1975/03/01 | English | 65 |
An Improved Method for Scheduling Independent Tasks | 1971/09/01 | English | 65 |
Inventory control under a probabilistic time-varying, demand pattern | 1978/12/01 | English | 64 |