A survey of scheduling with controllable processing times

Article Properties
Cite
Shabtay, Dvir, and George Steiner. “A Survey of Scheduling With Controllable Processing Times”. Discrete Applied Mathematics, vol. 155, no. 13, 2007, pp. 1643-66, https://doi.org/10.1016/j.dam.2007.02.003.
Shabtay, D., & Steiner, G. (2007). A survey of scheduling with controllable processing times. Discrete Applied Mathematics, 155(13), 1643-1666. https://doi.org/10.1016/j.dam.2007.02.003
Shabtay D, Steiner G. A survey of scheduling with controllable processing times. Discrete Applied Mathematics. 2007;155(13):1643-66.
Journal Categories
Science
Mathematics
Technology
Engineering (General)
Civil engineering (General)
Technology
Technology (General)
Industrial engineering
Management engineering
Applied mathematics
Quantitative methods
Refrences
Refrences Analysis
The category Technology: Engineering (General). Civil engineering (General) 44 is the most frequently represented among the references in this article. It primarily includes studies from Annals of Operations Research The chart below illustrates the number of referenced publications per year.
Refrences used by this article by year
Citations
Citations Analysis
The first research to cite this article was titled The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times and was published in 2007. The most recent citation comes from a 2024 study titled The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times . This article reached its peak citation in 2015 , with 23 citations.It has been cited in 86 different journals, 10% of which are open access. Among related journals, the International Journal of Production Research cited this research the most, with 23 citations. The chart below illustrates the annual citation trends for this article.
Citations used this article by year