International Journal of Surface Mining, Reclamation and Environment

Title Publication Date Language Citations
Optimizing of stripping in a slate bank1994/01/01English6
Slope design based on geotechnical study and numerical modelling of a deep open pit mine in India1995/01/01English6
Avian diversity patterns at a constructed wetland: Use of ecological theory in the evaluation of a mine land reclamation technique1991/01/01English6
An investigation into rock drilling1991/01/01English6
Surface mining equipment cost analysis with a developed linear break even model1997/01/01English6
Managing the environment at the Black Angel Mine, Greenland1994/01/01English6
Bridging the Gap Between Quarrying Activity and the Public: A Case Study in Athens, Greece2001/12/01English6
Characterization of Suspended Particulate Matter in Mining Areas in São Paulo, Brazil2002/09/01English6
Verification of a Large Scale Slope Instability Mechanism at Highland Valley Copper2004/12/01English6
Evaluation of high frequency ground penetrating radar (GPR) in mapping strata of dolomite and limestone rocks for ripping technique2005/12/01English6
A model study for blind pneumatic backfilling of fly ash in abandoned underground mines2005/12/01English5
Analysis of Landsat 5 TM Images for Monitoring the State of Restoration of Abandoned Quarries2004/06/01English5
Electrohydraulic Rock Blasting: An Alternative for Mining in Urban Areas2002/11/01English5
Mechanics of Oil Sands Slurry Flow in a Flexible Pipeline System2002/06/01English5
An introduction to the integrated design of surface mine haul roads1997/01/01English5
Water jet cutting techniques for processing of hard rock material1989/01/01English5
Characterisation of fly ash and bottom ash from a coal-fired power plant1996/01/01English5
Modelling, analysis and preliminary studies for automatic scooping/loading in a mechanical loader1992/01/01English5
Factor of safety of tetrahedral wedges: A probabilistic study1987/01/01English5
Application of goal programming in open pit planning1993/01/01English5
Estimating secondary mining potential of inactive and abandoned Appalachian highwalls1990/01/01English5
Optimising the number of load-haul-dump machines in a Swedish mine by using queuing theory: A case study1994/01/01English5
Computer simulation of complex dragline operations1997/01/01English5
Study of problems caused by oversized boulders in a mine production system: A case study1997/01/01English5
Hybrid Populus in reclamation1995/01/01English5
Establishment of trees on minesoils during drought and wet years1995/01/01English5
Optimal mine operating strategy for a fluctuating price1992/01/01English5
Assessment of blasting efficiency by seismic surveys and rope shovel performance monitoring: A case study1991/01/01English5
Development of an air attenuation model for noise prediction in surface mines and quarries2000/01/01English5
New trends in drilling and blasting technology2000/01/01English5